Completed flat and pitched roof refurbishment from above, Worcester Crematorium
Home/Projects/Worcester Crematorium

Worcester Crematorium roof refurbishment

529m² of flat and pitched roof refurbished with Garland UK systems, following ongoing leaks and water ingress, together with new insulation, dome rooflights, box guttering and downpipes.

529m²Total roof area refurbished
329m²Flat roofing, Garland StressPly Signature BUR
200m²Pitched metal roofing, Garland R-Mer Loc
GarlandUK manufacturer for both roof systems
Project background

The brief

Absolute Waterproofing was appointed to deliver a comprehensive roof refurbishment at Worcester Crematorium following ongoing leaks, water ingress damage and deterioration of the existing roof coverings.

The brief called for a long-term waterproofing solution across the flat and pitched roof areas. Improving the building's weather resistance, maintaining its appearance and minimising disruption to day-to-day operations were central requirements.

Primary objective

Provide a robust roofing solution that addresses the reported water ingress and supports the long-term protection of the building.

Existing condition

The existing roof and early works

The early-stage photographs record the roof areas before installation of the replacement systems. They show rooflight openings, existing roof surfaces and perimeter areas within the working environment.

Existing roof and rooflight openings, Worcester CrematoriumBefore
02Existing roof and rooflight openings.
Roof surface during early works, Worcester CrematoriumBefore
03Roof surface during early works.
Roof perimeter and adjoining areas, Worcester CrematoriumBefore
04Roof perimeter and adjoining areas.
A coordinated refurbishment

The requirement extended beyond replacing the main roof coverings. Insulation, rooflights, guttering and downpipes formed part of the same package, allowing the refurbishment to address the roof surfaces and the elements that bring daylight into the building and manage rainwater.

Survey, preparation and installation

The roofing solution

Following a detailed roof survey, a tailored refurbishment package was developed using Garland UK roofing systems. Different systems were selected for the flat and pitched roof areas, creating a coordinated solution across a total of 529m².

  1. Strip-out and preparation

    Works commenced with removal of the existing roof coverings back to the structural deck where required. This prepared the relevant roof areas for the replacement build-up. The strip-out and preparation formed the starting point for the insulation and roofing installation.

  2. New roof insulation

    New insulation was installed as part of the refurbishment to improve thermal performance. The insulation and replacement roof coverings formed an integrated roof build-up, bringing the thermal upgrade and waterproofing works together within the same package.

  3. Flat roof waterproofing, 329m²

    Garland StressPly Signature Built-Up Roofing (BUR) was installed across 329m² of flat roof areas. The system provided the replacement waterproof covering to these sections. The flat roof scope also included the interfaces with rooflights, perimeters and adjoining roof elements, where the waterproof covering meets changes in the roof geometry.

  4. Pitched metal roofing, 200m²

    A further 200m² of pitched roofing received Garland's R-Mer Loc Metal Roofing System. This renewed the weatherproof finish to the pitched sections, providing a durable roofing surface and enhancing the appearance of these areas alongside the flat roof works.

  5. Integration of the roof areas

    Using complementary roofing systems allowed the solution to respond to the different roof forms. The complete refurbishment included both the main roof surfaces and the associated components: dome rooflights, box guttering and downpipes.

Associated works and detailing

The complete roof package

Completed flat roof areas, dome rooflights and adjoining roof sections, Worcester CrematoriumCompleted
05Completed flat roof areas, dome rooflights and adjoining roof sections.

New dome rooflights

New dome rooflights were installed as part of the refurbishment, renewing these roof elements alongside the surrounding coverings. Their junctions with the refurbished flat roofing formed part of the waterproofing scope, bringing the rooflights and roof finish together as one installation.

Aluminium box guttering

New aluminium box guttering was installed to collect runoff from the relevant roof areas. Including the guttering in the refurbishment addressed rainwater collection alongside the replacement coverings, rather than treating the roof surface and drainage as separate works.

New rainwater downpipes

New downpipes completed the rainwater goods package, carrying collected water from the guttering through the building's rainwater drainage route. Together, the replacement box gutters and downpipes renewed the roof's water collection and discharge components.

Coordinated scope

Roof coverings, insulation, dome rooflights, box guttering and downpipes were brought together within a single refurbishment package.

Completed refurbishment

The result

Aerial view of the completed building and refurbished roof areas, Worcester CrematoriumCompleted
06Aerial view of the completed building and refurbished roof areas.

The completed refurbishment has provided Worcester Crematorium with a modern, robust roofing solution designed to deliver long-term waterproofing performance. The works addressed the deteriorated coverings and existing water ingress issues whilst renewing the appearance of the roof.

Combining StressPly Signature BUR with the R-Mer Loc Metal Roofing System provided a solution suited to each roof type. New insulation, dome rooflights, aluminium box guttering and downpipes extended the improvements to the wider roof package.

Project outcomes

Weather protection

Replacement flat and pitched roof coverings, with systems selected for the different roof areas.

Thermal upgrade

New roof insulation incorporated within the refurbishment build-up.

Rooflight renewal

New dome rooflights installed alongside the refurbished roof coverings.

Rainwater management

New aluminium box gutters and downpipes to collect and direct roof runoff.

Take the case study with you

Download the full Worcester Crematorium case study as a PDF, or share this page with a colleague.

Systems and sector

What this project drew on

More projects

Also delivered

Next step

Have a similar project?

Send us the outline or the tender and a surveyor will come back to you, usually the same working day.

Make an enquiry

Have a project for us?

Give us the outline below, or email sales@absolutewp.co.uk, and one of our surveyors will come back to you, usually the same working day.

Your division South and Midlands office Jubilee Estate, Gorsey Lane, Coleshill, West Midlands B46 1JU Call the Midlands office Email us
Your division North and Scotland office Riverside, Mountbatten Way, Congleton CW12 1DY Call the Northern office Email us
Free diagnostic survey We attend site quickly from the initial enquiry and provide an inspection report at no cost, with digital photographs, options and costs for the proposed work.

Prefer to talk it through? Call the office nearest the site and ask for a surveyor.