Waterproofing works to a headquarters office building on an occupied business park, with access and deliveries planned around tenants and car parking.
One Central Boulevard is a headquarters office building on Blythe Valley Park in Solihull, fully occupied and with a car park that the tenants needed every day of the project.
The waterproofing works were planned around the building: scaffold and edge protection positioned to keep the car park usable, deliveries timed away from the morning and evening peaks, and the roof phased so the offices below were never exposed. The roof carries plant and ductwork, all of which was detailed and encapsulated within the new membrane.
The result is a clean, guaranteed membrane roof with permanent edge protection, handed over with the drawings and maintenance schedule the building manager needs.
Completed
Completed
Completed
A refurbishment of ten building roofs across a live city centre campus, phased around teaching and access constraints, with the waterproofing designed...

A 1,950 square metre strip of the existing waterproofing to the woodwool deck, deck replacement in areas, new rooflights and windows, alterations to...

A two layer bituminous membrane overlay across 1,000 square metres of school roof, every rooflight replaced, and a new PV system installed on...
Send us the outline or the tender and a surveyor will come back to you, usually the same working day.
Give us the outline below, or email sales@absolutewp.co.uk, and one of our surveyors will come back to you, usually the same working day.