Liquid Applied Roofing Systems in Leicester: A Practical Guide

Liquid applied roofing systems in Leicester: where they suit commercial roofs, what drives performance and cost, and how long areas are closed for works.

Liquid applied waterproofing is often a good fit for detailed, occupied or awkward commercial roofs in and around Leicester, but it is not right for every roof. This guide is for estates teams, main contractors, developers and managing agents. It covers where liquid systems work, where another system may be better, what affects performance, and how long a roof area is usually out of use while the work is done.

Where liquid applied systems make sense

Liquid applied membranes are cold applied resins, usually polyurethane, PMMA or modified bitumen based. They are laid with a reinforcement fleece set into the wet coat, which gives a seamless membrane. With no laps or seams to weld or bond, they suit roofs with lots of penetrations, plant upstands, rooflight kerbs and awkward junctions, where a sheet membrane would need many separate details.

No naked flame is used, so hot works is not a concern. That matters on occupied buildings such as schools, hospitals, colleges and university estates.

  • Overlaying existing felt or asphalt that is still sound, where a full strip out is not justified
  • Balconies, walkways, podiums and plant decks
  • Detailing around plant, pipework and penetrations
  • Gutter lining on industrial and commercial buildings
  • Refurbishing one section of a larger roof without disturbing the rest

When another system may be the better choice

Liquids are not always the best answer. Large, open roofs with few details can often be covered more cheaply with single ply or a built up bituminous system. If the deck is failing or the insulation is wet, coating over it simply traps the problem. Because we install bituminous, single ply, liquid applied and hot melt systems from several manufacturers, our recommendation starts with the roof, not with a product we would rather sell.

A condition survey should come first. It should include core samples, adhesion tests and moisture readings where needed, so you know whether the existing build up can stay or has to be stripped.

What affects performance and cost

Rates per square metre vary a lot depending on preparation, the system specified and access. When you compare quotes, compare the full specifications line by line, not just the headline figures.

  • Substrate preparation, priming and repairs to blisters, splits or failed laps
  • System build and coat thickness. Manufacturer guarantees commonly run from 10 to 25 years depending on the specification
  • Weather. Most resins need a dry surface, temperatures above roughly 5°C and the surface above dew point, although PMMA systems can cure in colder conditions
  • Access, scaffolding and edge protection
  • Whether the work counts as renovating a thermal element under Part L, which may mean upgrading the insulation. Check this at specification stage

How long a roof area is closed off

For planning purposes, a typical section of 50 to 100 m² with standard detailing usually takes two to five working days from preparation to the final coat. The area stays closed to foot traffic for that whole time. Many polyurethane systems need several hours between coats and around 24 hours before light foot traffic. PMMA can cure in under an hour, which helps where an area has to reopen quickly. Larger roofs are normally phased so that only one part is out of use at a time. Rain or cold can add days, so build some slack into the programme, especially between October and March. Some resins give off a smell, so air intakes near the work area may need to be shut off for a while, or a low odour product can be used.

Planning work in Leicester

Leicester is within easy reach of our Coleshill office, which covers the Midlands and the South. For schools and academy trusts, the summer holiday is the usual window, so surveys and specifications are best done in spring to leave time for approvals and ordering materials. NHS and university sites often need tighter phasing around access routes and occupied rooms below.

We are NFRC members and hold CHAS and Constructionline Gold. Through the Absolute Group we can also provide scaffolding and safety netting under the same appointment, which keeps coordination simpler on busy sites.

Frequently asked questions

Can a liquid system go over our existing felt roof?

Often, yes, as long as a survey confirms the existing roof is sound, well bonded and dry. Adhesion tests and moisture checks should be done before you commit to an overlay.

How long will a liquid applied roof last?

It depends on the resin, the coat thickness and how the roof is maintained. Manufacturer guarantees commonly range from 10 to 25 years, and regular inspections help you get the full life out of it.

Can the work go ahead while the building is occupied?

Usually, yes. The systems are cold applied with no naked flame, so the main things to manage are access, phasing and odour near air intakes.

Published 2026-11-05 by Absolute Waterproofing Limited.

Next step

Want a surveyor to look at it?

Send us the outline through the form and one of the team will come back to you, usually the same working day.

Make an enquiry

Have a project for us?

Give us the outline below, or email sales@absolutewp.co.uk, and one of our surveyors will come back to you, usually the same working day.

Your division South and Midlands office Jubilee Estate, Gorsey Lane, Coleshill, West Midlands B46 1JU Call the Midlands office Email us
Your division North and Scotland office Riverside, Mountbatten Way, Congleton CW12 1DY Call the Northern office Email us
Free diagnostic survey We attend site quickly from the initial enquiry and provide an inspection report at no cost, with digital photographs, options and costs for the proposed work.

Prefer to talk it through? Call the office nearest the site and ask for a surveyor.